Here is the order things happen on a typical Houston new home purchase, what to lock down at each step, and how each step compares with buying a resale. By the end, you will know where buyers lose leverage on a new build and how to keep it.
| Step | What to lock down | The resale version |
|---|---|---|
| 1. Before the first model home | Outside preapproval, your agent, your all in monthly budget | Preapproval and agent before you tour |
| 2. Community and lot | Lot premium, drainage, MUD and PID notices, HOA dues | Neighborhood and the specific house |
| 3. Builder contract | Deposit terms, incentive conditions and dates, delay terms | Offer, option period, repair negotiation |
| 4. Design center | A selections budget and how upgrades affect the appraisal | Usually nothing to choose |
| 5. Construction | Independent inspections at each stage | One option period inspection |
| 6. Final walk and closing | Written punch list, escrow set on finished value | Final walk on the agreed repairs |
| 7. The first year | Homestead filing, the month 11 inspection, warranty claims | Homestead timing depends on qualification and the prior owner’s exemption |
Step 1: Before your first model home visit
Settle three things before you walk in: your financing, your representation and your real monthly budget.
Get preapproved with an outside lender first, even if you expect to use the builder’s lender for an incentive. With mortgage rates averaging 7.33% in October 2026, a builder’s rate buydown can be valuable, but you can only judge it against a loan estimate from someone else.
Decide on representation now. The sales counselor works for the builder. If you want your own agent, many builders require that agent to be with you or registered on your first visit, and showing up alone first can make that harder later. If you are buying for the first time, my first time home buyer guide covers the financing basics.
Then set your budget on the full monthly payment, not the price. In a newer section of Cypress, Fulshear or Pearland, taxes, HOA dues and any PID assessment can matter as much as the price. For a hypothetical 30 year fixed loan at 7.33%, borrowing another $25,000 adds about $172 a month in principal and interest. A 0.5 percentage point tax rate difference on a hypothetical $400,000 value adds about $167 a month before exemptions.
Step 2: Choosing the community and the lot
The lot is the one thing you can never change later, so give it more time than the floor plan.
- Lot premium. Corner, cul de sac, greenbelt and larger lots often carry a premium. Ask what it is, in writing, before you fall for the lot.
- Drainage. Look at where water goes: the slope of the yard, nearby detention ponds and any drainage easements. Check the lot against current flood maps. Review available flood history, drainage records and insurance pricing for the actual lot before your contractual deadline. A map designation alone does not tell you every source of flooding.
- The neighbors you do not see yet. Ask what is planned for vacant land nearby, including future roads, retail and the next home sections.
- The notices. You should receive a MUD notice before you are bound to a contract, plus a separate notice for a public improvement district. Read the MUD tax rate and the PID assessment, including the annual installment and remaining obligation.
- HOA dues and rules. Get the current dues and any planned increase as the community builds out.
On a resale, you see the finished street and the mature trees. Inspect the finished grading and ask about drainage history; dry weather alone will not show how the yard handles heavy rain. On a new lot, you are relying on plans, so ask more questions.
Step 3: Signing the builder contract
This is where most of your leverage is set. Builder contracts are written by the builder, and the terms vary a lot from one builder to the next.
Start with the price you were quoted. The model home is usually loaded with upgrades, so ask for the written list of what is standard at that price and what is extra.
Read it for these terms before you sign:
- The deposit. How much, when it becomes nonrefundable and what happens to it if your financing falls through.
- Incentive conditions. The dollar amount, the required lender if any, and both deadlines: the sign by date and the close by date. If the build or your loan slips past the closing deadline, the incentive can disappear.
- The completion date. An estimated completion date is not a promise. Find the clause that says what happens if the builder runs late. For a hypothetical two month delay at $2,000 a month for temporary housing, budget another $4,000 before storage or a rate lock extension. Check who pays those costs and what cancellation rights the contract gives you.
- Change orders and disputes. How changes are priced after signing, and whether disputes go to arbitration.
On a resale, negotiate the option fee and period in the contract, then deliver the fee on time to preserve the unrestricted termination right. Builder contracts often do not work that way, which is why the reading happens before you sign.
Step 4: The design center
Set your selections budget before your design appointment, not during it.
Upgrades add up quickly, and the appraisal will not necessarily credit every dollar you spend on finishes. If the home appraises below the contract price, you may have to cover the gap in cash. Ask which selections are structural and must be chosen now, such as extra outlets, plumbing locations or a covered patio, and which are cosmetic and cheaper to add later.
Keep a copy of every selection sheet and price. Those pages become your checklist at the final walk.
Step 5: Construction and your inspections
New does not mean defect free, and the city inspection is not working for you. Hire your own inspector at each stage:
- Before the foundation pour, to check the forms, plumbing placement and reinforcement
- Before drywall, while framing, plumbing, wiring and insulation are still visible
- Before closing, to build the written punch list
Get the builder’s written approval for independent inspections before you sign the contract, and ask how much notice the superintendent needs. My Houston home inspection guide covers what each stage should look for.
Put every question and request in writing. A conversation with the superintendent on site is helpful, and an email afterward is your record.
Step 6: Final walk and closing
At the final walk, compare the house against your selection sheets and your inspector’s punch list. Every open item should be in writing with a date for completion. Confirm that the survey matches the lot you chose, and that the HOA dues and the MUD and PID figures on your closing documents match the notices you signed.
Then look at the taxes behind your monthly payment. Texas appraises property as of January 1. If your home was still under construction on that date, the first tax bill may reflect only the lot or a partly built house. Here is a hypothetical example of what that does to escrow. The values and the 2.8% rate are illustrative, not figures for any address:
| Tax year | Value on January 1 | Taxes at 2.8% before exemptions | Monthly escrow need |
|---|---|---|---|
| Year you close | $70,000 lot only | $1,960 | $163 |
| First full year | $400,000 finished home | $11,200 | $933 |
Separate the new ongoing tax deposit from any repayment of a past shortage. They can appear in the same payment increase, so keep a cash reserve beyond the first year’s low estimate.
If escrow is funded on lot value, a shortage can follow when taxes reflect the completed home. Ask for a written finished value estimate and an escrow plan before closing.
On a resale, the tax history is already there. You can look up the prior year’s bill and the exemptions, though the seller’s exemptions do not carry over to you.
Step 7: The first year in the home
Three tasks protect you in year one.
File your homestead exemption. The school district exemption is $140,000. If you buy after January 1, own and occupy the home as your principal residence, and the preceding owner did not receive the same exemption that tax year, you can qualify for the applicable portion of the year. Apply before the first purchase anniversary for that partial year exemption. File within that window. If it has passed, ask the appraisal district whether you qualify under the late application rules.
Schedule the month 11 inspection. Book an inspector before the first year of warranty coverage ends, then submit everything they find to the builder in writing.
Know the defect process. If a warranty claim turns into a dispute, Texas law generally requires detailed written notice by certified mail, return receipt requested, at least 60 days before a construction defect action, and the builder can inspect and make a written offer to repair. Your inspection reports and repair correspondence support that notice.
A resale buyer’s first year looks different: no build schedule to manage. Check any transferable warranty on a resale and budget for repairs beyond its coverage. The 40,253 single family listings at the end of October 2026 included both new and existing homes. For a resale, use comparable sales, condition and that seller’s terms to decide what to request up front.
Touring model homes soon? Book a buyer consultation before your first visit, and we will set your budget and your contract questions first.
If you’re a veteran or military family buying in Houston, schedule a consultation.
What you get when you work with The Gee Team
- Representation from your first model home visit through closing
- A review of lots, MUD and PID notices and HOA terms before you commit
- Builder contract and incentive review, with every condition and deadline in writing
- Coordination of stage inspections, the final walk and your month 11 inspection
General information only. Tax rates, exemptions and contract terms depend on the specific property, your appraisal district and the documents you sign.